Supply routes and choke points for critical-path commodities
Structural steel, switchgear and imported cement reach a site through ports, rail hubs, border crossings and depots, and one failure at a shared stop delays every critical activity behind it. Keystone keeps a library of routes for key commodities, ties critical-path activities to them and ranks the choke points they share.
In previewBuilt and tested against stand-ins; not yet tested by us against the real system.
A library of routes that mean the same everywhere
A route is described by the places it passes: "Hormuz, Dammam, Riyadh" or "Perth, Broome, North West Basin". The library is shared across portfolios, so the same corridor is the same route at every level of the WBS, and the figures roll up and down.
- Typing a route lists the routes like it that already exist, so a corridor is reused and not duplicated
- Stops can be origins, ports, rail hubs, border crossings, depots, laydown areas and logistics facilities
Critical activities tied to their route
A planner marks that a critical-path activity depends on a key commodity, then picks the route that supplies it. Tying a route is never mandatory. A missing route is a warning, and the customer can switch the warning off.
- Critical activities with no route are listed, each with a link to the project where the route is chosen
- The warning is the customer's to keep or to switch off
Choke points, ranked
A choke point is a port, rail hub, border crossing, depot, laydown area or logistics facility that many routes, critical activities and projects share. They are ranked by how many critical activities pass through, with the days of delay blamed on them beside the count.
- Open a choke point to see the routes through it and the open activities that would be hit
- A port on three routes carrying cement, steel and glass, with 5, 4 and 3 critical activities behind them, shows 12 critical activities passing through
- Delay days are counted once, however many routes share the same cause
On a map, coloured by how the route is doing
Routes are drawn as lines in red, amber or green from the days of delay blamed on the route, measured against your own thresholds, and from the number of late critical activities. Each colour also has its own line style, so the map reads without colour.
- Laydown areas and logistics facilities are localised per project, and a point is captured by clicking the map
- For each route, the alternative routes carrying the same commodity, so a re-routing or logistics discussion starts with real options on the screen
- A route with no cause of delay linked to it is grey, not green, because nothing says how it is doing
- Until the customer sets its own thresholds, amber starts at 10 days and red at 30
Zoomed out in Horizon, Vista and Vantage
Horizon holds the route library and the route cards on each project. A zoomed-out supply monitoring page in Horizon, Vista and Vantage shows every route in scope at once. In Vantage, a red or amber route gives you a ready risk statement to copy into the risk register.
- Horizon: the library, the route card on each project and the choke point ranking
- Vista and Vantage: the supply monitoring page across the portfolio
- Vantage: a risk statement from a red or amber route
Related
- Schedule management and quality (Horizon)Every schedule in the portfolio, planned, checked and compared in one place.
- Executive reporting (Vista)The monthly executive report for every district, programme and project.
- Risk and issue management (Vantage)Risks and issues on the portfolio structure, with schedule and cost risk analysis on live data.
Questions
What is a choke point in a supply chain?
A stop that many routes share, such as a port or a border crossing. If it fails, every critical activity whose commodity passes through it is late at the same time.
Do we have to tie every activity to a route?
No. Routes are optional. A critical activity with no route gets a warning, and you can switch the warning off.
How is a route coloured red, amber or green?
By the days of delay blamed on the route against your amber and red thresholds, and by how many critical activities supplied over it are late. Two late critical activities make a route red.
Can a route be reused in another portfolio?
Yes. The library is shared, so the same corridor is the same route everywhere and its figures roll up and down the WBS.